ESC Plan, Wondoan

O2 was commissioned by EnviroAgent Services to prepare an Erosion and Sediment Control Plan (ESCP) for the initial phase of the approved Carbon Transport and Storage Corporation (CTSCo) Appraisal Project, near Wandoan, Queensland. A Certified Practitioner in Erosion and Sediment Control (CPESC) from O2 undertook a site inspection, completed fieldworks and prepared the ESCP.

Download the Project Sheet.

ESC Plan for Bruce Highway Upgrade, Cooroy to Curra

O2 provided Environmental Engineering services over a 12 month period to the Department of Transport (DTMR) and its design consultant GHD for the Bruce Highway Upgrade Project (Cooroy to Curra) Section A, between the Cooroy southern interchange to Sankeys Road.

Download the Project Sheet.

Water Monitoring Plan, Northern Territory

O2 was engaged by EnviroAgent Services on behalf of Armour Energy Ltd to develop a water monitoring plan for the shale gas exploration being undertaken within a 118 814m2 tenement in Eastern Northern Territory.

The aim of the project was to provide sufficient desktop information on flora, fauna, soils, hydrology and surface water to inform the preparation of a Notice of Intent (NOI) as part of the environmental impact assessment process in the Northern Territory.

Download the Project Sheet.

ESC Plan for Bruce Highway Upgrade, Cairns

O2 was commissioned by BMD ALBEM to prepare an Erosion and Sediment Control (ESC) plan for the Bruce Highway Upgrade in Cairns. The Cairns Bruce Highway Upgrade

The objective of the ESC plan was to minimise the impact of erosion and sediment discharge to Environmental Values of receiving waters during the construction period.

Download the Project Sheet.

ESC Plan for Arrow Energy

O2 was commissioned by Arrow Energy to prepare a Conceptual Erosion and Sediment Control Plan (CESCP) formultiple sites for gas pipeline construction and associated infrastructure in Queensland.

The first ROW in the Surat Basin was approximately 19.5km with a number of minor vand major water crossings. Works included pipe, dam, pilot areas including laydown areas and well pads.

Download the Project Sheet.

 

Stormwater Management Plan Rockhampton

O2 prepared a Stormwater Management Plan (SMP) for Watpac Specialty Services for a proposed mixed-use development located on Main Street in Rockhampton. The proposed space included retail outlets, residential units and a carpark, with a total area of approximately 2,020m2.

The SWMP addressed the stormwater quality and quantity management for the proposed development, based on a Request for Further Information (RFI) issued by Rockhampton Regional Council.

Download the Project Sheet